Banner image placeholder
Banner image
Research laboratory in Industrial Safety Engineering and Sustainable Development
Institute of Maintenance and Industrial Safety

Curriculum vitae


University of Oran2 Mohamed ben Ahmed



HYBRID GENETIC ALGORITHM FOR FLEXIBLE JOB-SHOP SCHEDULING PROBLEM


Journal article


Mohammed El Amine Meziane, Nassima Aissani
vol. 10, 2014 Jul, pp. 267-274

Cite

Cite

APA   Click to copy
Meziane, M. E. A., & Aissani, N. (2014). HYBRID GENETIC ALGORITHM FOR FLEXIBLE JOB-SHOP SCHEDULING PROBLEM, 10, 267–274.


Chicago/Turabian   Click to copy
Meziane, Mohammed El Amine, and Nassima Aissani. “HYBRID GENETIC ALGORITHM FOR FLEXIBLE JOB-SHOP SCHEDULING PROBLEM” 10 (July 2014): 267–274.


MLA   Click to copy
Meziane, Mohammed El Amine, and Nassima Aissani. HYBRID GENETIC ALGORITHM FOR FLEXIBLE JOB-SHOP SCHEDULING PROBLEM. Vol. 10, July 2014, pp. 267–74.


BibTeX   Click to copy

@article{meziane2014a,
  title = {HYBRID GENETIC ALGORITHM FOR FLEXIBLE JOB-SHOP SCHEDULING PROBLEM},
  year = {2014},
  month = jul,
  pages = {267-274},
  volume = {10},
  author = {Meziane, Mohammed El Amine and Aissani, Nassima},
  month_numeric = {7}
}


Share

Translate to